National Blueprint · One of 195

South Sudan

The youngest nation on Earth, with 12.2 million citizens, oil that pays about nine-tenths of the state, and electricity for one citizen in twenty.

  • 5.4%With electricity, 2024
  • About 90%Of government revenue from oil
  • 82.3%Below the national poverty line, 2016

You are entering

The Perfect South SudanReDesign Studio

Where South Sudanese and Co-designers design the nation they want to live in.

Everyone who shares a vision, a voice or an enterprise here becomes a Co-designer of Perfect South Sudan: one of a community of selfless people, at home and abroad, building a nation where every citizen has a decent life.

Become a Co-designer

One mission. Three depths.

Every mandate makes the same four moves for South Sudan. What changes is how deep we go, and how far the work travels toward market.

  1. 01Identify the assets
  2. 02Estimate Perfect Capita
  3. 03Co-design the capital architecture
  4. 04Launch the instruments
  1. Mandate 013 hours

    The Nation Briefing

    A private session for the people who decide.

    You leave withThe gap, named and sized

    The four moves at this depth
    1. 01The five sovereign assets on this page, walked through.
    2. 02Coverage of 0 and the Gap, explained.
    3. 03The instruments that could close the Gap, shortlisted.
    4. 04The path to market, outlined.
    Request a Nation Briefing
  2. Mandate 023 days

    The Blueprint Lab

    Your team and ours, working the blueprint together.

    You leave withThe structure, drawn

    The four moves at this depth
    1. 01The ledger tested against your ministries’ own data.
    2. 02Each of the seven standards costed in South Sudanese prices.
    3. 03One financing structure, drawn with your team.
    4. 04A term sheet and the partners to approach.
    Plan a Blueprint Lab
  3. Mandate 03End to end

    The Sovereign Mandate

    Led personally by the President and CEO.

    You leave withA structure ready for market

    The four moves at this depth
    1. 01A full sovereign asset ledger, valued and verified.
    2. 02Perfect Capita set and agreed with government, with a monitoring plan.
    3. 03The full structure: legal form, credit enhancement, guarantees and pricing.
    4. 04Taken to investors and development partners, through to close.
    Discuss a Sovereign Mandate

For the Government of South Sudan, its development partners and investors. Scope and fees are agreed in writing before any work begins.

South Sudan in Bloom, nation portrait of South Sudan
South Sudan in BloomNation Portrait · The Gallery
Perfect Nations™ · Letters to the NationsSouth Sudan

Dear South Sudan,

Almost everything your state spends is paid for by oil that must travel through another country to reach the sea. … Oil pays for the state. It has not yet paid for a decent life.

“Oil has paid for the state. Water, land and people can pay for a decent life.”

Yours in design,Preeti SinhaPresident and CEO, Perfect NationsRead the full letter

Solutions

Solutions for Perfect South Sudan

How super intelligence (SI) and innovative financing for development (FFD) close the gap to the seven basic standards of living, for every citizen of South Sudan.

All Solutions
  • The Solution for South SudanEnergy

    Finance clean power and clean cooking at national scale.

    • 01The challenge12.2m South Sudanese who cook without clean fuel or technology: almost everyone. World Bank, 2024
    • 02How FFD solves itSovereign green bond: Bond money ring-fenced for clean energy under a published framework, with every allocation reported to investors. At work in South Sudan: Energy Sector Access and Institutional Strengthening Project, $50M. Source
    • 03How SI solves itSI counts the households still cooking with wood, charcoal or kerosene, prices the switch per home, and tracks every project the bond pays for.
    Co-design it inThe ReDesign StudioThe three mandates

ReDesign Studio · Writings

Write Perfect South Sudan into being.

An essay, an article or a true story of up to 1,500 words: your vision of Perfect South Sudan and the economic solutions to achieve it. Original and unpublished, published with your name and your permission.or email contact@perfectnations.org

Submit your writing

Sovereign Assets

Five assets no balance sheet counts.

Each is owned today, earns today, and can lift South Sudan closer to Perfect Capita.

  • Oil fields in Unity State, South Sudan01

    The Oil

    About 90%Of government revenue, World Bank, 2022

    Exported through a single pipeline across Sudan, damaged in February 2024.

  • The Sudd wetland on the White Nile02

    The Nile and the Sudd

    2,359 m³Renewable fresh water per person, 2022

    The White Nile and the great wetlands of the Sudd.

  • Cattle camps in South Sudan03

    The Land

    44.7%Of land in agriculture, 2024

    Cattle and farmland across nearly half the country.

  • Solar panels at a clinic in South Sudan04

    The Sun

    0.4%Renewable share of electricity output, 2021

    A grid run almost wholly on diesel, under an equatorial sun.

  • A street in Juba05

    The People

    12.2mCitizens, 2025

    Four in five live in the countryside.

What each asset is worth, and how far it can carry South Sudan toward Perfect Capita, is the question our research and our guests take up below.

Sovereign Assets

ReDesign Studio · Perfect Capita

The South Sudan wheel: held at 0 by energy

Perfect Capita
South Sudan: coverage of the seven basic living standardsFOOD11.2WATER39.7SHELTER79.6ENERGY0EDUCATION–HEALTH41LIVELIHOOD23.5COVERAGE0OF 100 · SET BY ENERGY
  • To setPerfect CapitaThe yearly cost, per person, of lifting everyone above the Living Line in all seven basic living standards, set with South Sudan in its own prices.
  • To setThe price of Perfect South SudanPerfect Capita times the population: the national bill, each year.
  • 0CoverageOut of 100, set by energy, the standard South Sudan provides least.
  • 12.2mThe GapSouth Sudanese who cook without clean fuel or technology: almost everyone.
The Living Line, and how it is measured

The Living LineThe poverty line measures income. The Living Line measures a life: food, water, shelter, energy, education, health and livelihood. Perfect Capita is the yearly cost, per person, of lifting everyone above the Living Line in all seven basic living standards. Coverage scores each standard strictly out of 100, and a nation is held at its weakest: South Sudan at 0, by energy, with food at 11.2 and livelihood at 23.5 next.

Perfect Nations estimate, to be confirmed with South Sudan. Figures marked dated rest on surveys more than five years old; lenient measures are marked as such. The strict measures

Strict measures. Food: share not moderately or severely food insecure (FAO). Water: safely managed drinking water where measured; where it is not, basic water, marked as such. Shelter: the lower of safely managed sanitation and the share outside urban slums. Energy: the lower of electricity per person against 1,000 kWh and clean cooking. Education: the lower of children reading by the end of primary school and lower-secondary completion. Health: WHO service coverage index. Livelihood: share above the stricter of the national poverty line and the World Bank line for the nation’s income group. Each figure links to its source.

  • Food11.2%Not food insecure; 88.8% are moderately or severely food insecureFAO, 2024
  • Water39.7%Basic water; safely managed water is not measuredWHO/UNICEF, 2024
  • Shelter79.6%Outside urban slums; 94.2% of city dwellers live in slums; safe sanitation not measuredUN-Habitat, 2022
  • Energy00% cook with clean fuels and technologyWorld Bank, 2024
  • EducationNot measuredNeither reading nor completion is publishedUNESCO
  • Health41WHO service coverage indexWHO, 2023
  • Livelihood23.5%Above US$3.00 a day; 76.5% live below it, datedWorld Bank, 2016

The Research · Capital Architecture

7 instruments. Care, cash and community, in a state run on oil.

Capital Architecture

The record in figures

  • $200MCOVID-19 Emergency Response and Health Systems Preparedness, Additional Financing: Health systemWorld Bank
  • $129MProductive Safety Net for Socioeconomic Opportunities Project: Plus $70m additional financing, September 2024World Bank
  • $120MEnhancing Community Resilience and Local Governance Project, Phase II: Community infrastructureWorld Bank
  • $117MHealth Sector Transformation Project: Primary careWorld Bank
  • $70MWomen’s Social and Economic Empowerment Project: Livelihoods for womenWorld Bank

The register · 7 instruments and investments on record

  • MultilateralActiveCOVID-19 Emergency Response and Health Systems Preparedness, Additional FinancingApproved 31 March 2022 · Investment project financing$200M

    Health system

    Strengthens the health system and essential services.

    World Bank

    Source
  • MultilateralActiveProductive Safety Net for Socioeconomic Opportunities ProjectApproved 6 June 2022 · Investment project financing$129M

    Plus $70m additional financing, September 2024

    Cash for work and livelihood support for poor households.

    World Bank

    Source
  • MultilateralActiveEnhancing Community Resilience and Local Governance Project, Phase IIApproved 15 March 2022 · Investment project financing$120M

    Community infrastructure

    Builds community infrastructure and local governance.

    World Bank

    Source
  • MultilateralActiveHealth Sector Transformation ProjectApproved 20 December 2023 · Investment project financing$117M

    Primary care

    Transforms the delivery of primary health care.

    World Bank

    Source
  • MultilateralActiveWomen’s Social and Economic Empowerment ProjectApproved 24 May 2022 · Investment project financing$70M

    Livelihoods for women

    Supports women’s livelihoods and safety.

    World Bank

    Source
  • MultilateralActiveEnergy Sector Access and Institutional Strengthening ProjectApproved 25 April 2023 · Investment project financing$50M

    The guarantee furthest from reach

    Extends electricity access where 5.4% of citizens are connected.

    World Bank

    Source
  • MultilateralActiveBuilding Skills for Human Capital DevelopmentApproved 15 May 2023 · Investment project financing$45M

    Plus $44m additional financing, September 2024

    Skills and learning for young people.

    World Bank

    Source

The South Sudan Newswire

The Solutions Wire
Achol Deng, Nation Steward of South Sudan

Achol DengNation Steward of South Sudan · SI ResearcherEvery change is sourced and reviewed before it is published.

ReDesign Studio · Enterprises

Already working in South Sudan.

Suggest an enterprise
  • In preparation

    The enterprises building Perfect South Sudan

    The Stewards are verifying the companies and social enterprises already delivering the seven basic living standards in South Sudan. Suggest one to include.

    Suggest an enterprise

ReDesign Studio · Voices of South Sudan

Launching soon

The people already building it.

The question every guest answers
“What does South Sudan already own, and how could it pay for a decent life for every citizen?”

We are looking for the people with real stories from South Sudan: the leaders who built something that works, and the keepers of local knowledge who know how their communities live, cope and thrive.

The South Sudan ReDesign Studio is open

Design Perfect South Sudan with us.

Share your vision, suggest a guest, or write to us. Every message receives a personal reply.

Sources
  1. World Bank, World Development Indicators, accessed 12 October 2026: population 2025, urban share 2025, land in agriculture and forest 2024, electricity access 2024, renewable fresh water per person 2022, natural resource rents, renewable share of electricity output 2021.
  2. WHO UHC service coverage index, 2023 (WHO Global Health Observatory). WHO/UNICEF JMP basic drinking water (via World Bank). FAO prevalence of undernourishment (via World Bank). UN-Habitat urban slum share, 2022 (via World Bank). National poverty headcount, latest survey (via World Bank).
  3. Al Jazeera, 26 March 2024, citing a 2022 World Bank report: oil about 90% of government revenue; pipeline damaged in February 2024.
  4. World Bank project pages for each register entry, as linked. The World Bank projects database lists few approvals after 2024; newer operations may be missing.
Scroll to Top