Energy & Gas Infrastructure · Pipeline
$30–42BEstimated total project investment
Tanzania LNG Project — Lindi
Framework signed 2022 · Host Government Agreement negotiations ongoing · FID targeted end of 2025 · First LNG projected 2029–2030
Shell operates Blocks 1 and 4 offshore Tanzania with a 60% interest, having identified roughly 16 trillion cubic feet of recoverable gas; Equinor operates the adjacent Block 2 with a 65% interest alongside ExxonMobil’s 35% stake, on a further 20 trillion cubic feet. Together the partners and the Tanzanian government are negotiating the terms of a liquefaction terminal at Lindi on the southern coast, fed by a roughly 100-kilometre subsea pipeline from deepwater reserves — a single project sized at up to $42 billion, on the order of a third of Tanzania’s entire GDP, that will define the country’s fiscal position for decades depending on how the host government agreement’s terms are ultimately struck.
16–20 TcfRecoverable gas identified
2022Framework agreement signed
LindiPlanned terminal site
2029–30Projected first LNG
Energy & Gas Infrastructure
Read About the LNG Project
Completed
$2.9BSelf-funded, budgeted cost
Julius Nyerere Hydropower Project (JNHPP)
Construction 2019–2025 · Connected to national grid 2025 · Rufiji River
East Africa’s largest hydropower plant, 2,115 megawatts across nine turbines on the Rufiji River, built by Egyptian contractors Arab Contractors and El Sewedy Electric after the World Bank and other international financiers declined to back it over environmental concerns tied to the Selous Game Reserve. Tanzania self-funded construction through its national budget instead, with El Sewedy separately securing a $500 million loan from the African Export-Import Bank, guaranteed by United Bank for Africa and CRDB Bank.
Arab ContractorsEl Sewedy ElectricAfreximbankGovt of Tanzania
Read more →
Completed
$1.46B550km electrified line, Lots 1–2
SGR Phase 1 — Dar es Salaam–Makutupora
Financed 2017–2021 · Standard Chartered-arranged · Passenger service launched July 2024
The first 550 kilometres of Tanzania’s new electrified standard-gauge railway, contracted to Turkey’s Yapi Merkezi and financed through a Standard Chartered-arranged facility. Passenger trains began running the Dar es Salaam–Morogoro–Makutupora corridor in July 2024 — the first electrified passenger rail service anywhere in East Africa.
Standard CharteredYapi MerkeziGovt of Tanzania
Read more →
Active
$1.2BAfDB-led, two-tranche syndication
SGR Western Extension — AfDB Syndication
Signed December 2024 · Tabora–Kigoma, 411km
The African Development Bank acted as initial mandated lead global coordinator, with Deutsche Bank and Société Générale as co-mandated lead arrangers, syndicating financing for the 411-kilometre Tabora–Kigoma extension. The line links Dar es Salaam’s port toward Lake Victoria and onward regional corridors into neighbouring countries, opening new mining and agricultural export routes across Eastern and Central Africa.
African Development BankDeutsche BankSociété Générale
Read more →
Active
$2.33BECA-backed plus commercial tranches
SGR Lots 3–5 Completion Financing
Signed 2026 · Makutupora–Isaka–Mwanza, 679km
Standard Chartered, acting as sole lender to Tanzania’s Ministry of Finance, arranged $2.33 billion to complete the remaining Dar es Salaam–Mwanza corridor: Lots 3–4 (Makutupora–Isaka, contracted to Yapi Merkezi) and Lot 5 (Isaka–Mwanza, contracted to China Civil Engineering Construction Corporation). The package combines $1.32 billion in export-credit-agency-backed financing — Sweden’s EKN and SEK, Poland’s KUKE, Italy’s SACE and China’s Sinosure — with $462 million in commercial and development-bank funding and a $559 million covered facility.
Standard CharteredYapi MerkeziCCECCExport Credit Agencies
Read more →
Pipeline
≈$4BTotal pipeline investment
East African Crude Oil Pipeline (EACOP) — Tanga Terminal
79% complete as of October 2025 · Targeted completion July 2026
A 1,443-kilometre heated pipeline carrying Ugandan crude from Hoima to an export terminal at Tanga on Tanzania’s coast. Tanzania hosts four of the pipeline’s six pumping stations and an estimated 10,000-plus Tanzanian construction jobs; once complete, roughly 190,000 barrels a day are expected to be stored and exported through Tanga’s facilities.
TotalEnergiesUganda National Oil CompanyTanzania Petroleum Development CorpGovt of Uganda
Read more →
Active
$1.046BECF total, plus RSF disbursements
IMF Extended Credit Facility & Resilience and Sustainability Facility
ECF approved July 2022 (40-month) · RSF layered on 2024 · 5th/2nd reviews concluded June 2025
Tanzania paired a $1.046 billion, 40-month Extended Credit Facility arrangement approved in July 2022 with a Resilience and Sustainability Facility layered on afterward — combining ordinary IMF program financing with the newer climate-resilience facility. The fifth ECF review and second RSF review concluded together with the 2025 Article IV consultation in June 2025, unlocking a combined disbursement of roughly $448.4 million.
International Monetary Fund
Read more →
Active
$227M$212M IDA credit + $15M grants
World Bank Blue Economy & Climate Resilience Package
Approved June 2025 · TAFSAM + SCALE projects
Two IDA-financed projects approved the same day: TAFSAM ($117 million) to scale up sustainable marine fisheries and aquaculture management, and SCALE ($110 million) to fund locally led climate action across selected districts for an estimated 6.6 million people — including ecotourism, agroforestry, beekeeping and reforestation livelihoods around protected areas.
World BankIDAPROBLUE
Read more →
Active
$200MIDA credit
World Bank Railway Safety & Resilience IDA Credit
Approved March 2024 · Dar es Salaam–Isaka meter-gauge line
Funds safety, climate-resilience and operational-efficiency upgrades on the older 970-kilometre Dar es Salaam–Isaka meter-gauge line operated by Tanzania Railways Corporation, including the Kilosa–Gulwe–Igandu section, reaching an estimated 3.5 million direct and indirect beneficiaries — about 5% of Tanzania’s population.
World BankIDATanzania Railways Corporation
Read more →
Active
$282.07MAfDB approval
AfDB Zanzibar & Mafia Islands Electrification
Approved July 2025 · Part of AfDB/World Bank Mission 300
Finances submarine power cables and clean-cooking distribution across Zanzibar (Unguja and Pemba) and Mafia Island, aiming to raise power capacity from 143 to 440 megawatts, connect roughly 465,000 people to electricity, and distribute clean cooking appliances to over 335,000 residents — part of the joint AfDB/World Bank Mission 300 initiative to connect 300 million Africans to power by 2030.
African Development BankWorld Bank (Mission 300)Govt of Zanzibar
Read more →
Active
$120MAfDB loan
AfDB Malagarasi Hydropower Project
Approved November 2020 · River diversion milestone 2025
A roughly 50-megawatt hydropower plant on the Malagarasi River in Kigoma Region, Western Tanzania, intended to bring reliable renewable power to households, schools, clinics and small businesses beyond the reach of the national grid. The project passed a major river-diversion milestone in 2025, even as construction delays have drawn government scrutiny.
African Development BankGovt of Tanzania
Read more →
Active
€166MSecond EU grant tranche
EU Blue Economy & Global Gateway Partnership
Announced October 2022 · Part of a wider Global Gateway package series
European Union Global Gateway financing supporting Tanzania’s blue economy — coastal ecosystem protection, sustainable ocean-based enterprise and ocean governance reform — sitting alongside parallel EU packages for digital, energy, transport, health and girls' education, as part of the EU’s plan to mobilise up to €300 billion continent-wide by 2027.
European UnionGovt of Tanzania
Read more →
Active
TZS 3.1B184kg lot, single December 2024 auction
Tanzanite State-Backed Formalization & Auctions
First state auction since 2017 · December 2024
Tanzania held its first state-run tanzanite auction since 2017, part of a wider push to formalize small-scale mining, tighten smuggling controls, and route a larger share of the gemstone’s value through government-supervised channels — tanzanite is found in a single deposit near Mererani, nowhere else on Earth, giving Tanzania a genuine monopoly the state is now trying to actually capture the value of.
Ministry of MineralsTanzania Mineral Audit Agency
Read more →
Active
Sh350B+≈$130M, NCAA revenue target
Ngorongoro Conservation Area Tourism Revenue
FY2025/26 target, up from Sh269.9B collected FY2024/25
The Ngorongoro Conservation Area Authority set a revenue target of more than 350 billion shillings for FY2025/26, up from 269.9 billion shillings the year before — proceeds the Authority says help fund healthcare, electricity, water and education nationally, alongside plans to develop new sites like the Amboni Caves and the Songwe meteorite site to diversify visitor revenue beyond the crater itself.
Ngorongoro Conservation Area Authority
Read more →
Pipeline
TBDInstitution-building stage
Zanzibar Capital Markets Plan
Announced in the 2026/27 budget · June 2026
Zanzibar’s semi-autonomous government has proposed establishing its own stock exchange and investment bank, following Dar es Salaam, Nairobi, Kampala and Kigali into dedicated securities-market infrastructure — a bid to give the islands' tourism-driven economy direct access to capital markets, though commentators note the institution-building (regulation, custody, listable audited companies) will take years, not a budget cycle.
Revolutionary Government of Zanzibar
Read more →
Advocacy
68Member economies, pooled voice
V20 Group Membership
Vulnerable Twenty Group · Ongoing
As a V20 member, Tanzania pools its advocacy and technical capacity with dozens of other climate-vulnerable economies — sharing access to the group’s Sustainable Insurance Facility and joint finance-ministry positioning ahead of COP and G20 negotiations, rather than negotiating climate finance terms for its drought- and flood-exposed agricultural economy alone.
V20 Group
Read more →